The renovation project for Lumby’s Pat Duke arena has run into hurdles in its design stage, the Regional District North Okanagan announced Wednesday. (photo submitted)

North Okanagan arena renovations facing design challenges

Despite design hurdles, target construction start date remains Spring 2020

  • Aug. 31, 2019 9:00 a.m.

Lumby’s Pat Duke Arena has run into problems in the design stage of its $3 million renovation project, but it’s still sticking to its target construction start date of Spring 2020.

The more than 50-year-old arena – which won the 2016 Kraft Hockeyville competition – is in need of more change rooms, particularly a dedicated room for women who have never had adequate facilities during co-ed games in the building. The arena is also not up to current accessibility standards and is ill-equipped to accommodate people with mobility issues.

The arena was the subject of extensive planning and consultation work in late 2018, which have helped MQN Architecture & Interior Design in its design plan for the renovations. However, their efforts to complete a design have uncovered challenges inherent to the building’s age.

“In an older building, unforeseen challenges are not uncommon. Most of the complications have been related to the age of the building,” said Tannis Nelson, manager of Community Services.

“Building codes have changed a lot since this centennial arena was commissioned in 1967, and we must conform to current codes. This has required a lot of thoughtful problem solving and innovative solutions,” Nelson said.

Related: Lumby’s Pat Duke Memorial Arena plans finalized, public’s opinion sought

Related: Lumby arena renovations looming

“This is a significant investment that we are making for the future,” said Rick Fairbairn, Chair of the White Valley Parks, Recreation and Culture Advisory Committee. “We are committed to moving it along as quickly as possible, but we also want to make sure that we get it right.”

A community effort to fundraise for improvements to the arena began in 2016. As a result, Lumby won Kraft Hockeyville and received $100,000 to put towards the facility.

More than $2.5 million was awarded on top of that in March 2018 to make more extensive arena improvements. Grants from TELUS and the Regional District North Okanagan and community fundraising have also helped to cover the $3 million price tag on the renovation project.

Read More: Lumby pedalling toward bike park

Read More: More downtime announced for Tolko Armstrong, Lumby divisions


Brendan Shykora
Reporter, Vernon Morning Star
Email me at Brendan.Shykora@vernonmorningstar.com
Follow us: Facebook | Twitter

hockey

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Construction begins on 180-unit rental complex in Penticton

Rental community with 138 two-bedroom units and 42 one-bedroom units to be built on old trailer park

Professional misconduct lands Penticton lawyer $15k fine

Daniel Kay Lo fined $15,000 by B.C. Law Society after admitting to five counts of misconduct.

Highway 97 petition founder encouraged by public’s reaction

Printed out, the list of 26,000 names creates a stack of paper four inches thick.

RDOS hears concerns about 5G wireless technology

Potential safety concerns raised as communications technology expands

Mental health disorders, suicide on the rise among Okanagan students

The survey was conducted by the McCreary Centre Society in 2018

UPDATE: Protesters say they will maintain blockade near Chase “as long as it takes”

Signs at protest site say in solidarity with Wet’suwet’en

Petition seeks to remove local police department from Lindsay Buziak murder case

American woman starts online petition in hopes of helping Buziak family

Deaths on popular Shuswap trail ruled accidental

B.C. Coroners Service reports on fatal falls in May and July 2019

Study says flu vaccine protected most people during unusual influenza season

Test-negative method was pioneered by the BC Centre for Disease Control in 2004

Saskatchewan and B.C. reach championship round at Scotties

British Columbia’s Corryn Brown locked up the last berth in Pool B

‘Chain reaction pile up’ closes southbound traffic on Coquihalla Highway

Black Press Media has reached out to RCMP, paramedics for details

Federal minister to speak in North Okanagan

Greater Vernon Chamber welcomes middle class prosperity minister to talk money

B.C. lawyer, professor look to piloting a mental-health court

In November, Nova Scotia’s mental-health court program marked 10 years of existence

EDITORIAL: Thoughtless posts to Facebook cause real harm and stress

At the risk of resembling a broken record, it needs to be… Continue reading

Most Read